The Story

This isn't just about zoning codes. It's about a pattern of promises made and broken.

2017
City buys the land. The purchase agreement commits to "preserve existing trees, open spaces and irrigation ditch."
2020–25
Neighbors invest. Families buy homes bordering the parcel, trusting the city's commitment. Property values reflect the promise of preserved open space.
Late 2025
City proposes 84 units at 18 units/acre. Buildings up to 5 stories. No prior notice to the 18 homeowners whose backyards directly border the parcel.
Jan 2026
Citizen outcry works. After months of organized response, the City Commission agrees to a consensus-based engagement process with Harvest Creek HOA.
Mar 2026
Hanson Lane annexation filed — separately. This could predetermine R-B zoning for the entire Fowler corridor, undermining the consensus process the city just agreed to.
Apr 20
Community Development Board recommended approval — despite 84+ written and 12 oral public comments opposing R-B zoning. The CDB recommendation now goes to the City Commission.
May 5
City Commission vote — this is the deciding meeting. Written comments due by not later than noon on Tuesday, May 5, 2026 to [email protected]. Two back-to-back votes: annexation and zoning. Meeting at 6:00 PM, City Hall (121 N Rouse Ave). Hanson Lane is Agenda item N.

See the pattern? Here's what you can do →

Two Proposals, One Neighborhood

Bozeman needs housing. But we don't build 5-story towers in 1-story neighborhoods. Two interconnected proposals would fundamentally change the Fowler Avenue corridor — and the Harvest Creek neighborhood next to it.

“We aren't saying not in our backyard. We aren't saying don't build. We are just asking you to work with us and not approve this high-density plan.”

— Nina Harrison, Harvest Creek HOA Subcommittee

Below are the facts on both proposals, what they mean for your neighborhood, and exactly how to make your voice heard.

Issue 1: Hanson Lane Annexation

Application 25775 — City Commission Vote May 5

What's Proposed

Putting it in perspective

5 stories = 45 feet. That's the height of Bozeman City Hall. Imagine that behind your backyard, separated by a 6-foot fence.

Why R-B Zoning Is Wrong

It's textbook spot zoning. Surrounding properties are R-1/R-2 single-family homes at ≤6 units/acre. Dropping R-B density into an established low-density area is disfavored under Montana law.

The Community Plan doesn't require it. The "Urban Neighborhood" designation is a growth policy statement, not a regulation. R-A zoning satisfies it without R-B intensity.

The area lacks transit and services. R-B is designed for areas with good transit and walkable shopping. The closest shopping is over a mile away — a 30-minute walk each way. No reliable public transit serves this area.

The Precedent Problem

If R-B is approved here, it sets the stage for R-B zoning on every parcel along Fowler between Durston and Oak — transforming the entire corridor into high-density development directly adjacent to single-family neighborhoods.

Traffic & School Safety

The annexation extends Annie Street as a through street. Without traffic calming, Annie becomes an unobstructed corridor leading directly to Emily Dickinson Elementary School at 2435 Annie Street. Children walk this route daily.

What Neighbors Want

R-A zoning (≤6 units/acre) — consistent with the surrounding development pattern, the growth policy, and the future land use map. Include this parcel in the existing consensus process rather than approving zoning in isolation.

📅
City Commission Vote — Hanson Lane Annexation (App 25775)
May 5, 2026 — 6:00 PM
City Hall, 121 N Rouse Ave, Bozeman — Agenda item N
Written comments by not later than noon on Tuesday, May 5, 2026: [email protected]

Issue 2: Fowler Housing Development

Consensus Process Underway

What's Proposed

How narrow is the site?

150 feet wide — half a football field. After 35-foot setbacks: 80 feet. After road and driveways: only 30 feet for structures. That's narrower than a two-car garage is long.

Why the Current Plan Is Wrong

No buffer from existing homes

18 homeowners have backyards directly bordering the parcel. Unlike every other R-3 to R-1 transition in Bozeman, there is no roadway buffer between the development and existing backyards. About 50% of surface parking and alleyways would run along property lines.

Traffic on residential streets

168 new cars

That's roughly one car every 35 seconds during rush hour on Caterpillar and Farmall Streets — residential roads not designed for this volume. No access is planned from Fowler Avenue itself.

Not actually affordable

$450K–$650K units don't qualify as affordable housing by any standard metric. No grants, sponsorships, or nonprofit collaboration (HRDC, Trust Montana) have been announced. Other R-3 affordable developments are already underway elsewhere (160 acres at Baxter/Cottonwood).

Inadequate public process

The proposal was fast-tracked without sufficient public input. No outreach via mail, email, or door-to-door canvassing to the adjacent homeowners most affected.

The broken promise

2017 Purchase Agreement

“Preserve existing trees, open spaces and irrigation ditch.”

2026 Proposal

84 units, 4–5 stories, parking lots and alleyways running along existing backyards.

The Consensus Process

On January 6, 2026, after months of citizen outcry, the City Commission invited Harvest Creek HOA to participate in a consensus-based engagement process. Preliminary mediation interviews are underway. Any separate zoning actions — like the Hanson Lane annexation — risk undermining this process before it can produce results.

What Good Development Looks Like

Bridger View — just a mile away — is the model. 1–2 story homes, 50% greenspace, ADA-compliant, used as a Federal Reserve case study for successful affordable housing. That's what neighbors are asking for — not zero development, but right-sized development.

What neighbors want: max 8 units/acre, 1–2 stories, at least 50% greenspace, no road connections to Harvest Creek, entrances on Fowler Ave only, and a 3–5 year planning horizon with secured grants and a consensus process.

📅
Fowler Housing Development
Consensus process ongoing — your written comment still matters
Written comments: [email protected]

The Road: Fowler Avenue Connector

The road project and housing proposals are interdependent. The Fowler Avenue Connection will extend Fowler from Oak Street to Huffine Lane as a 2-lane minor arterial with shared-use paths, a roundabout at Annie/Durston, and a traffic signal at Babcock.

2026
Phase 1: Oak to Durston
Construction begins summer 2026
2027
Phase 2: Durston to Babcock
2028
Phase 3: Babcock to Huffine

At the 60% design stage, the Harvest Creek buffer was reduced from 30 feet to 15 feet. Development should be planned in direct coordination with road construction — not decided in isolation beforehand.

What You Can Do

The 3-minute civic workout. Every step counts.

1

Write your comment 60 seconds

Our tool generates a personalized public comment for both proposals. You review it, edit if you want, and send from your own email.

Generate Your Comment →
2

Share with 3 neighbors 30 seconds

Copy a ready-made message and paste it where your neighbors are.

3

Mark your calendar 10 seconds

Comments are due by not later than noon on Tuesday, May 5, 2026. The Commission vote is at May 5, 2026 — 6:00 PM at City Hall (121 N Rouse Ave). You can attend in person, give remote oral comment, or just send written comment ahead of the deadline.

4

Show up

There are only 5 City Commissioners. If 3 of them hear from enough neighbors, the zoning proposal fails. Your comment is not symbolic — it's decisive.

Learn More

Official City Resources
News Coverage
The Bridger View Model
Key Contacts
161 neighbors have already commented

Join them. Write yours.

Generate Your Comment →

It takes about 60 seconds. You review everything before it's sent.