The Story
This isn't just about zoning codes. It's about a pattern of promises made and broken.
See the pattern? Here's what you can do →
You don't need to understand zoning to protect your neighborhood. Two city proposals would put high-density, high-rise development right next to Harvest Creek homes. Here's what's happening and what you can do about it.
Write Your Comment →Takes about 60 seconds. Keep reading for the full story ↓
This isn't just about zoning codes. It's about a pattern of promises made and broken.
See the pattern? Here's what you can do →
Bozeman needs housing. But we don't build 5-story towers in 1-story neighborhoods. Two interconnected proposals would fundamentally change the Fowler Avenue corridor — and the Harvest Creek neighborhood next to it.
“We aren't saying not in our backyard. We aren't saying don't build. We are just asking you to work with us and not approve this high-density plan.”
— Nina Harrison, Harvest Creek HOA Subcommittee
Below are the facts on both proposals, what they mean for your neighborhood, and exactly how to make your voice heard.
5 stories = 45 feet. That's the height of Bozeman City Hall. Imagine that behind your backyard, separated by a 6-foot fence.
It's textbook spot zoning. Surrounding properties are R-1/R-2 single-family homes at ≤6 units/acre. Dropping R-B density into an established low-density area is disfavored under Montana law.
The Community Plan doesn't require it. The "Urban Neighborhood" designation is a growth policy statement, not a regulation. R-A zoning satisfies it without R-B intensity.
The area lacks transit and services. R-B is designed for areas with good transit and walkable shopping. The closest shopping is over a mile away — a 30-minute walk each way. No reliable public transit serves this area.
If R-B is approved here, it sets the stage for R-B zoning on every parcel along Fowler between Durston and Oak — transforming the entire corridor into high-density development directly adjacent to single-family neighborhoods.
The annexation extends Annie Street as a through street. Without traffic calming, Annie becomes an unobstructed corridor leading directly to Emily Dickinson Elementary School at 2435 Annie Street. Children walk this route daily.
R-A zoning (≤6 units/acre) — consistent with the surrounding development pattern, the growth policy, and the future land use map. Include this parcel in the existing consensus process rather than approving zoning in isolation.
150 feet wide — half a football field. After 35-foot setbacks: 80 feet. After road and driveways: only 30 feet for structures. That's narrower than a two-car garage is long.
18 homeowners have backyards directly bordering the parcel. Unlike every other R-3 to R-1 transition in Bozeman, there is no roadway buffer between the development and existing backyards. About 50% of surface parking and alleyways would run along property lines.
That's roughly one car every 35 seconds during rush hour on Caterpillar and Farmall Streets — residential roads not designed for this volume. No access is planned from Fowler Avenue itself.
$450K–$650K units don't qualify as affordable housing by any standard metric. No grants, sponsorships, or nonprofit collaboration (HRDC, Trust Montana) have been announced. Other R-3 affordable developments are already underway elsewhere (160 acres at Baxter/Cottonwood).
The proposal was fast-tracked without sufficient public input. No outreach via mail, email, or door-to-door canvassing to the adjacent homeowners most affected.
“Preserve existing trees, open spaces and irrigation ditch.”
84 units, 4–5 stories, parking lots and alleyways running along existing backyards.
On January 6, 2026, after months of citizen outcry, the City Commission invited Harvest Creek HOA to participate in a consensus-based engagement process. Preliminary mediation interviews are underway. Any separate zoning actions — like the Hanson Lane annexation — risk undermining this process before it can produce results.
Bridger View — just a mile away — is the model. 1–2 story homes, 50% greenspace, ADA-compliant, used as a Federal Reserve case study for successful affordable housing. That's what neighbors are asking for — not zero development, but right-sized development.
What neighbors want: max 8 units/acre, 1–2 stories, at least 50% greenspace, no road connections to Harvest Creek, entrances on Fowler Ave only, and a 3–5 year planning horizon with secured grants and a consensus process.
The road project and housing proposals are interdependent. The Fowler Avenue Connection will extend Fowler from Oak Street to Huffine Lane as a 2-lane minor arterial with shared-use paths, a roundabout at Annie/Durston, and a traffic signal at Babcock.
At the 60% design stage, the Harvest Creek buffer was reduced from 30 feet to 15 feet. Development should be planned in direct coordination with road construction — not decided in isolation beforehand.
The 3-minute civic workout. Every step counts.
Our tool generates a personalized public comment for both proposals. You review it, edit if you want, and send from your own email.
Generate Your Comment →Copy a ready-made message and paste it where your neighbors are.
Comments are due by not later than noon on Tuesday, May 5, 2026. The Commission vote is at May 5, 2026 — 6:00 PM at City Hall (121 N Rouse Ave). You can attend in person, give remote oral comment, or just send written comment ahead of the deadline.
There are only 5 City Commissioners. If 3 of them hear from enough neighbors, the zoning proposal fails. Your comment is not symbolic — it's decisive.
It takes about 60 seconds. You review everything before it's sent.